Wednesday, September 25, 2013

SiteManager TX2.012 change orders with 3rd party funding

Greetings,

The option to record third party funding with your contract change order is only available with the SiteManager Terminal and Citrix servers.

 

The option is unavailable on the client “Non-Inspector” version of the software and it will remain so until a new update to the software is distributed to the client machines.

 

This is likely to be after the iDriveIT Hardware Refresh initiative is complete.

 

Thank you,

 

Stewart DeWitt

Construction Division

(512) 416-2462

Stewart.DeWitt@txdot.gov

 

 

Drunk drivers wreck cars. And lives.

Faces of Drunk Driving


Thursday, September 5, 2013

SiteManager upgrade 3.8a tx2.012 scheduled for September 13th

Greeting,

On Friday, September 13, 2013 IT will begin the process of updating your SiteManager application to the latest release. The new version (3.8a tx 2.012) will be made available for install through LANDesk. The upgrade process will begin at 6 PM on Friday and will proceed through Saturday and Sunday (all times central). SiteManager (Citrix, MTS and client) and SiteManager reporting will be unavailable for the duration. SiteManager is scheduled to be available again Monday, September 16th at 6 AM or sooner.

 

  • Please make every attempt to keep all SiteManager PC's powered on during this period.
  • Maintenance (MNT) workstations are to be included.
  • It is mandatory that standalone users check in all work prior to 6:00 PM Friday, September 13, 2013.
  • Remember – When users open SiteManager for the first time after the upgrade the user ID field on the logon screen will be blank. SiteManager user ID’s are case sensitive and 99% of these ID’s are all upper case characters.
  • The inclusion of MNT users could result in a high number of support calls.

 

Webinars are scheduled for Tuesday September 10th at 10:30 AM and 2:30 PM to review the updates to the software. You may find the specific meeting details at https://txdot.webex.com by searching the calendar of scheduled meetings. The password for entry is “sitemanager”.

This 3.8a tx2.012 upgrade contains these significant changes.

  • Maintenance Contracts Pay in SiteManager

You may exhale. Yes, the long awaited release of MNT in SiteManager is upon us. If everything goes as planned you will soon hear your MNT brothers and sisters proclaiming the virtues of SiteManager. At this time only contracts let after September 1st will be loaded to SiteManager for payment (no facility contracts).

 

We have relied on the MNT Division to introduce the application to their users, but I expect many of you will be called on to assist them where necessary. For the most part their SiteManager is your SiteManager, with the exception of three main areas.

§  Maintenance Distribution window

After estimate generation this window will allow the MNT user to distribute the cost across the applicable segments. Estimate approval cannot conclude until all costs are distributed.

§  DWR Calendar window Segment 78 Distribution

While working with a MNT contract, users of the DWR Calendar will have the option to distribute costs to the segment 78 functions and assets.

§  MMS (Compass) SiteManager interface

The DWR Calendar option to distribute costs to the segment 78 is dependent on an interface between SiteManager and MMS. A MMS contract is required before segment 78 costs can be distributed through SiteManager.

 

  • Material Test Tester Required

To ensure that a tester is identified with a material test, all tests for material samples must now identify a tester. Test data can be saved with a material sample record, but before a stamp code is added a tester must be identified. *

 

  • Material Sample Authorization

To ensure adequate segregation of duties for our quality assurance material testing, we have included a check to prevent a single user from testing, reviewing (stamp coding) and authorizing a sample. Of the three groups (tester, reviewer, authorizer) at least two individuals must be documented and no single user can be documented doing all three when marking a sample accepted.

 

  • FHWA Change Order Comments

FHWA engineers will have their own dedicated comments section in the change order header window. Users with the FHWA Engineer role have permission to leave up to ten 225 character date stamped comments.

 

 

* Note - Available testers are listed with each test method as recorded within the Labinator or the Approved Lists within SiteManager. For a tester to be available for a material sample test record the test’s start date must fall between a tester’s effective and expiration dates for the test. This is a change. Previously the current date was used when displaying the available testers.

 

 

 

Thank you,

 

Stewart DeWitt

Construction Division

(512) 416-2462

Stewart.DeWitt@txdot.gov

 

 

 

 

 

 

Drunk drivers wreck cars. And lives.

Faces of Drunk Driving


Recall: SiteManager upgrade 3.8a tx2.012 scheduled for September 13th

Stewart DeWitt would like to recall the message, "SiteManager upgrade 3.8a tx2.012 scheduled for September 13th".
Drunk drivers wreck cars. And lives.

[Faces of Drunk Driving]<http://www.txdot.gov/inside-txdot/media-room/news/statewide/028-2013.html>

SiteManager upgrade 3.8a tx2.012 scheduled for September 13th

Greeting,

On Friday, September 13, 2013 IT will begin the process of updating your SiteManager application to the latest release. The new version (3.8a tx 2.012) will be made available for install through LANDesk. The upgrade process will begin at 6 PM on Friday and will proceed through Saturday and Sunday (all times central). SiteManager (Citrix, MTS and client) and SiteManager reporting will be unavailable for the duration. SiteManager is scheduled to be available again Monday, September 16th at 6 AM or sooner.

 

  • Please make every attempt to keep all SiteManager PC's powered on during this period.
  • Maintenance (MNT) workstations are to be included.
  • It is mandatory that standalone users check in all work prior to 6:00 PM Friday, September 13, 2013.
  • Remember – When users open SiteManager for the first time after the upgrade the user ID field on the logon screen will be blank. SiteManager user ID’s are case sensitive and 99% of these ID’s are all upper case characters.
  • The inclusion of MNT users could result in a high number of support calls.

 

Webinars are scheduled for Tuesday September 10th at 10:30 AM and 2:30 PM to review the updates to the software. You may find the specific meeting details at https://txdot.webex.com by searching the calendar of scheduled meetings. The password for entry is “sitemanager”.

This 3.8a tx2.012 upgrade contains these significant changes.

  • Maintenance Contracts Pay in SiteManager

You may exhale. Yes, the long awaited release of MNT in SiteManager is upon us. If everything goes as planned you will soon hear your MNT brothers and sisters proclaiming the virtues of SiteManager. At this time only contracts let after September 1st will be loaded to SiteManager for payment (no facility contracts).

 

We have relied on the MNT Division to introduce the application to their users, but I expect many of you will be called on to assist them where necessary. For the most part their SiteManager is your SiteManager, with the exception of three main areas.

§  Maintenance Distribution window

After estimate generation this window will allow the MNT user to distribute the cost across the applicable segments. Estimate approval cannot conclude until all costs are distributed.

§  DWR Calendar window Segment 78 Distribution

While working with a MNT contract, users of the DWR Calendar will have the option to distribute costs to the segment 78 functions and assets.

§  MMS (Compass) SiteManager interface

The DWR Calendar option to distribute costs to the segment 78 is dependent on an interface between SiteManager and MMS. A MMS contract is required before segment 78 costs can be distributed through SiteManager.

 

  • Material Test Tester Required

To ensure that a tester is identified with a material test, all tests for material samples must now identify a tester. Test data can be saved with a material sample record, but before a stamp code is added a tester must be identified. *

 

  • Material Sample Authorization

To ensure adequate segregation of duties for our quality assurance material testing, we have included a check to prevent a single user from testing, reviewing (stamp coding) and authorizing a sample. Of the three groups (tester, reviewer, authorizer) at least two individuals must be documented and no single user can be documented doing all three when marking a sample accepted.

 

  • FHWA Change Order Comments

FHWA engineers will have their own dedicated comments section in the change order header window. Users with the FHWA Engineer role have permission to leave up to ten 225 character date stamped comments.

 

 

* Note - Available testers are listed with each test method as recorded within the Labinator or the Approved Lists within SiteManager. For a tester to be available for a material sample test record the test’s start date must fall between a tester’s effective and expiration dates for the test. This is a change. Previously the current date was used when displaying the available testers.

 

 

 

Thank you,

 

Stewart DeWitt

Construction Division

(512) 416-2462

Stewart.DeWitt@txdot.gov

 

 

 

 

 

 

Drunk drivers wreck cars. And lives.

Faces of Drunk Driving