Friday, May 31, 2013

Available: SiteManager XM shortcuts, DWR Summary and SiteManager Test Reporting

Access to the SiteManager XM shortcut, DWR Summary Report and SiteManager Test Reporting has been restored.

 

Thank you,

 

 

Stewart DeWitt

Construction Division

(512) 416-2462

Stewart.DeWitt@txdot.gov

 

Click It or Ticket


Recall: Temporarily unavailable: SiteManager XM shortcuts, DWR Summary and SiteManager Test Reporting

Stewart DeWitt would like to recall the message, "Temporarily unavailable: SiteManager XM shortcuts, DWR Summary and SiteManager Test Reporting ".
[Click It or Ticket]<http://www.txdot.gov/inside-txdot/division/traffic/safety/laws/clickit.html>

Temporarily unavailable: SiteManager XM shortcuts, DWR Summary and SiteManager Test Reporting

Currently SiteManager users are unable to access the SiteManager XM shortcut, DWR Summary Report and SiteManager Test Reporting. This includes the ability to report material test results with the use of the Excel test files. ISD has been made aware of the issue and we hope to have a resolution quickly.

 

 

 

 

Stewart DeWitt

Construction Division

(512) 416-2462

Stewart.DeWitt@txdot.gov

 

Click It or Ticket


Wednesday, May 15, 2013

SiteManager 3.8a Tx2.011 update

Upgrade:

As of this morning the LANDesk administrators report that there are 755 workstations or laptops still remaining to be updated.

 

Users of these 755 workstations/laptops that currently do not have access to the SiteManager for Terminal Server should report the issue immediately. Please submit an incident with TxDOTNow and include your computer name and address it to the attention of CSD_LANDESK.

 

For the remaining users please continue to use the Terminal Server option until the update is applied to your computer.

 

Custom ADHOC Reporting:

As it was mentioned with the May 9th notice , the administrative lock down for PC's at ISD is preventing the display of PDF reports in the web. As a result this option has temporarily been removed from the ADHOC custom report server. ISD is actively trying to restore this option and it is more than reasonable to believe that it will return by the end of this week.

 

 

Thank you,

 

Stewart DeWitt

Construction Division

(512) 416-2462

Stewart.DeWitt@txdot.gov

 

Click It or Ticket


Tuesday, May 14, 2013

SiteManager 3.8a tx2.011 update

In the last 24 hours the LANDesk group has been working to update more than 3800 SiteManager workstations to the new version.

 

I’m told this morning that more than 1800 have successfully been updated.

 

The update process is two parts.

 

To update your local SiteManager(Non- Inspector) application, the LANDesk administrator must first remove the previous version and then install the new version.

 

Unfortunately for some of you the lag between uninstall and reinstall has left you with no SiteManager option. This includes the working Terminal Server option you had yesterday.

 

If you are in this situation please submit an incident with TxDOTNow. Include your computer name and address it to the attention of CSD_LANDESK.

 

 

Thank you,

 

Stewart DeWitt

Construction Division

(512) 416-2462

Stewart.DeWitt@txdot.gov

 

Click It or Ticket


Monday, May 13, 2013

SiteManager update 3.8a 2.011

…More information

 

·         IT is currently working to restart the update so the SiteManager (Non-Inspector) may be available again by the end of the day or sooner.

·         Please close and keep closed your SiteManager (Non-Inspector) version while IT updates your computer.

·         You may use your SiteManager for Terminal Server option while IT updates your computer.

·         SiteManager for Terminal Server as an exclusive option is only temporary.

·         The first login screen for the SiteManager for Terminal Server option uses your Novell account and password.

·         Citrix users are not affected.

 

 

 

Stewart DeWitt

Construction Division

(512) 416-2462

Stewart.DeWitt@txdot.gov

 

Click It or Ticket


SiteManager Update 3.8a tx2.011

Ladies and Gentlemen,

 

The SiteManager update scheduled this previous weekend failed to update all workstations.

You and your users may get the message “SiteManager version has changed. Please update the software” when they attempt to login to the local SiteManager (Non-Inspector) version of SiteManager.

 

 

 

If this occurs please instruct your users to use the SiteManager  for Terminal Server option available on their desktops.

 

 

Thank you,

 

Stewart DeWitt

Construction Division

(512) 416-2462

Stewart.DeWitt@txdot.gov

 

Click It or Ticket


Thursday, May 9, 2013

Sitemanager ADHOC custom reporting

Due to the administrative lock down for PC's, the ISD servers that generate the ADHOC customer reports are currently unable to display the PDF reports in the web. In response to this ISD has temporarily removed the "view report in web" option. This option will return when the issue is resolved.

 

Thank you,

Stewart

Click It or Ticket


Monday, May 6, 2013

RE: Upcoming SiteManager 3.8a tx2.010

Folks,

 

here is the link to the WebEx site.  You’ll see the 2:00 SiteManager meeting link in the list of conferences. (example below)

https://txdot.webex.com/mw0306ld/mywebex/default.do?siteurl=txdot&service=1

 

Stewart will have the conference call number on the screen.  You’ll have to dial in to hear the audio.

 

Tom

 

 

 

 

 

From: Stewart DeWitt
Sent: Wednesday, May 01, 2013 4:03 PM
To: AUD-DDO; shd4971176.smblog@blogger.com; Dean Aaron; Kevin Setoda; Mike Tyler; Al Bass; Alex Quintanilla; Allen Shelley; Billy Fergerson; Bob Lindley; Carl Preston; Crystal Woodruff; David Norris; Diane Weishuhn; Donnie McNatt; Earl Anderson; Ellie Salgado; Gil Herndon; Gina Williams; Glenn Jaeger; Jeff Sweetland; Jim Zwiener-C; Joyce Bujak; Ken Jones; Mack Ballenger; Marjorie Roberts; Mark Pollard; Marylou Castillo; Miguel Hernandez; Mike Williams; Pat Swindell; Reuben Jackson; Stacey Worsham; Suzy Blaschke; Wil McCarley; Cliff Hallford; Merrie Rogge; Paul Norman; Darrell Caldwell; Kelli Navarrette; Laura Alwan; Mike Fowler; Shannon Argo; Susan Simpson; James Joslin; Rickie Shields; Thomas Young; Donna Roberts; Deb Zamorano; Mark Petrusek; Miguel Arellano; Sylvia Bockholt; Tad Nichols; Tim Wilhelm; Tommy Blackmore; Tracy Cooper; Andrea Murry; Gordon Bland; John Choate; Michael Skiles; Andy Berlan; Chris Cowen; Darlene Goehl; Sheryl Petroski; Zyna Polansky; Richard Walker; Tonya Shaw; Darwin Lankford; Denise Key; Gene Garcia; Jackie Taylor; James Harris; Ronald Hatcher; David Chapa; Deborah Shults; Ed Rodriguez; Laura Benavides; Lester Lindley; Mary Alice Hernandez; Mitzie Gibson; Noe Cabazos; Rudy Landa; Sandy Harris; Ali Habibi; Frank Mayfield; Glenn Eilert; Jay Tarwater; John Jameson; John Obr; Johnny Johnson; Juan Ortega; Roxana Garcia-Zinsmeyer; Scott Starkjohann; Barbara Shepherd; Brenda Sanchez; Chris Briggs; Debbie Burgess; Rhonda Schmid; Robert Delaney; Terry Bruce; Trena Brand; Ken Barnett; Maria Chavez; Susan Freres; Tomas Saenz; Bruce Matusek; Leticia Cruz; Alan Easterling; Brad Tate; Jackie Broussard; Peggy Cooper; Richard Williammee; Steve Bone; Andrus Harris; Emmanuel Isonguyo; Josiah Yuen; Loren Rice; Lovey Reynolds; Terri Hybner; Steven Hudson; Doug Y'Barbo; George Wilson; Sam Hankla; Tom Hunter; Vivian Harrison; Jose Saldana; Lilia Gutierrez; Rosa Trevino; Sergio Reyna; Becky Jares; Claudia Kern; Greg Jones; Jana Buck; Michael Dawidczik; Richard Izzo; Robert Sarcinella; Roy Collins; Bryan Raschke; Jack Lambert; Kathy Schlegel; KC Evans; Stephen Smith; Bill Guy; Cynthia Smith; James Hutchison; Leisha Hopkins; Ricky Daniels; Carlos Peralez; Jesus Limon; John Ramirez; Jorge Rendon; Rosendo Garcia; Crystal King; David Henke; Jackie Benavides; John Heye; Lea Jacobson; Lisa Rainosek; Cathey Galbreath; Jane Hughey; Ricky Moore; Mark Frick; Sherri Ralson; Terry Frick; Hilda Whetzel; Thomas Polansky; Kara Kelley; Mark Smith; Paul Wenzel; Sean Baker; Camille Marek; Gary Gould; George Vogt; Glen Dvorak; Jonathan Rogers; Judy Broomas; Kenneth Anthony; Sherry Hutchinson
Cc: Bill Kokas; Bobby Raytchev-C; James Bunner; Raymond Longoria-C; Thane Mitchell; Veronica Davis; Michael Underwood; Stewart DeWitt; Thomas De La Portilla
Subject: Upcoming SiteManager 3.8a tx2.010

 

On the evening of Friday, May 10, 2013 a process to update your SiteManager application to the latest release will begin. The new version (3.8a tx 2.011) will be made available for install through LANDesk. The upgrade process will begin at 6 PM on Friday and will proceed through Saturday and Sunday (all times central). SiteManager (Citrix, MTS and client) and SiteManager reporting will be unavailable for the duration. SiteManager is scheduled to be available again on Monday, May 13th at 6 AM or sooner.

 

·         Please make every attempt to keep all SiteManager PC's powered on during this period.

·         It is mandatory that standalone users check in all work prior to 6:00 PM Friday, May 10, 2013.

·         Remember – When users open SiteManager for the first time after the upgrade the user id field on the logon screen will be blank. SiteManager user ids are case sensitive and 99% of these ids are all upper case characters.

 

You are welcome to attend the WebEx meeting scheduled for Monday, May 6th at 10 am or 2 pm. We will review and discuss the changes described below. See the WebEx schedule for specific meeting information.  The password for the meetings is “sitemanager”.

This 3.8a tx2.011 upgrade contains these significant changes.

·         DWR authorization

The policy that requires DWR’s to be authorized by someone other than the creator will now be enforced by the application. Now when a user by means of a Diary attempts to authorize a DWR that they themselves created a prompt will notify the user that another party must authorize the DWR. Users will still have the option to unauthorize their own DWRs.

 

·         DWR Calendar option *

While incorporating changes in the DWR window for the Maintenance projects to pay in SiteManager, we took the opportunity to make some upgrades to the window. We created a new window - The new DWR calendar window which employees a monthly calendar view of an inspector’s DWRs. On the DWR Info tab (see figure 1a) the calendar displays each day and the inspector’s recorded DWRs. Recorded DWRs are detailed with a host of different icons including remarks, attachments, contractor personnel and equipment, and work items. Another added feature incorporated into the calendar is the option to cut, copy, and delete a DWR by right clicking a date and making a selection from the pop-up menu. The window is also equipped with a navigation tree that allows for quick reference and selection of DWRs recorded by all inspectors on the project (sorted by date or inspector). On the Work Items tab the item list has been expanded to include additional item information (see figure 1b) to include installed, authorized, reported, and paid quantities to name a few. A quick bookmark navigation option (right side of figure 1b) is included to aid in item selection. A single click on an item’s row displays the item’s DWR history at the bottom of the screen. Here an inspector can view all the previously recorded DWR for the selected item. The content can be filtered by unauthorized, unpaid, paid, or all DWRs.

 

  • Automatic updates - part II **

If you recall an attempt to include this with the last release of SiteManager failed due to technical difficulties and we elected to abandon the option until a later date. SiteManager can now determine if the SiteManager client is current and update the installation if it is not. A new application (SM Loader) is now included with each SiteManager installation. When a user starts SiteManager the app will read the local installation and compare it to the latest available version (see figure 2a). If the install is not current the app will install the latest version (see figure 2b). It is our hope that this new feature will allow us to bring you SiteManager enhancements quicker and with greater frequency.

 

  • Stock Account Change Orders

A new stock account function is included with the change order header window (see figure 3). With the selection of this function the change order is exclusively for the purchase of stock material and is automated to interface with Material & Supply Management System (MSMS) accounts. Our revised Contract Administration manual will reflect this change.

 

  • Financial Tools

This version includes three (3) new financial tools to automate essential financial duties. Primarily to be used by the Finance Division employees these new windows include the Estimate Staging (vouchering), Refund Processing (JVN220), and Administrative Hold (stop payment).

ü  Estimate Staging – For the District staff this is a read-only window that allows users to view the vouchering status of recently approved pay estimates. CCSJs listed have not been vouchered by our financial system.

ü  Administrative Hold – For the District staff and the Finance Division to place a payment hold on a contract. With permission granted through group security, users of this window may place, review or remove a hold for a contract.

ü  Refund Processing - For the District staff this is a read-only window that allows users to view the status of a contractor’s refund. The FIN Division will use this window to record funds received from the contractor. This window is aligned with the contract adjustment process to eliminate the accidental under or over payment to the contractor.

 

*   This is an optional window for recording DWRs. The original DWR window is still available and unchanged.

** This option is not available when in Standalone mode.


 


Thank you,

Stewart DeWitt

Construction Division

(512)416-2462

 

 

 

 

Stewart DeWitt

Construction Division

(512) 416-2462

Stewart.DeWitt@txdot.gov

 

Click It or Ticket


Wednesday, May 1, 2013

Upcoming SiteManager 3.8a tx2.010

On the evening of Friday, May 10, 2013 a process to update your SiteManager application to the latest release will begin. The new version (3.8a tx 2.011) will be made available for install through LANDesk. The upgrade process will begin at 6 PM on Friday and will proceed through Saturday and Sunday (all times central). SiteManager (Citrix, MTS and client) and SiteManager reporting will be unavailable for the duration. SiteManager is scheduled to be available again on Monday, May 13th at 6 AM or sooner.

 

·         Please make every attempt to keep all SiteManager PC's powered on during this period.

·         It is mandatory that standalone users check in all work prior to 6:00 PM Friday, May 10, 2013.

·         Remember – When users open SiteManager for the first time after the upgrade the user id field on the logon screen will be blank. SiteManager user ids are case sensitive and 99% of these ids are all upper case characters.

 

You are welcome to attend the WebEx meeting scheduled for Monday, May 6th at 10 am or 2 pm. We will review and discuss the changes described below. See the WebEx schedule for specific meeting information.  The password for the meetings is “sitemanager”.

This 3.8a tx2.011 upgrade contains these significant changes.

·         DWR authorization

The policy that requires DWR’s to be authorized by someone other than the creator will now be enforced by the application. Now when a user by means of a Diary attempts to authorize a DWR that they themselves created a prompt will notify the user that another party must authorize the DWR. Users will still have the option to unauthorize their own DWRs.

 

·         DWR Calendar option *

While incorporating changes in the DWR window for the Maintenance projects to pay in SiteManager, we took the opportunity to make some upgrades to the window. We created a new window - The new DWR calendar window which employees a monthly calendar view of an inspector’s DWRs. On the DWR Info tab (see figure 1a) the calendar displays each day and the inspector’s recorded DWRs. Recorded DWRs are detailed with a host of different icons including remarks, attachments, contractor personnel and equipment, and work items. Another added feature incorporated into the calendar is the option to cut, copy, and delete a DWR by right clicking a date and making a selection from the pop-up menu. The window is also equipped with a navigation tree that allows for quick reference and selection of DWRs recorded by all inspectors on the project (sorted by date or inspector). On the Work Items tab the item list has been expanded to include additional item information (see figure 1b) to include installed, authorized, reported, and paid quantities to name a few. A quick bookmark navigation option (right side of figure 1b) is included to aid in item selection. A single click on an item’s row displays the item’s DWR history at the bottom of the screen. Here an inspector can view all the previously recorded DWR for the selected item. The content can be filtered by unauthorized, unpaid, paid, or all DWRs.

 

  • Automatic updates - part II **

If you recall an attempt to include this with the last release of SiteManager failed due to technical difficulties and we elected to abandon the option until a later date. SiteManager can now determine if the SiteManager client is current and update the installation if it is not. A new application (SM Loader) is now included with each SiteManager installation. When a user starts SiteManager the app will read the local installation and compare it to the latest available version (see figure 2a). If the install is not current the app will install the latest version (see figure 2b). It is our hope that this new feature will allow us to bring you SiteManager enhancements quicker and with greater frequency.

 

  • Stock Account Change Orders

A new stock account function is included with the change order header window (see figure 3). With the selection of this function the change order is exclusively for the purchase of stock material and is automated to interface with Material & Supply Management System (MSMS) accounts. Our revised Contract Administration manual will reflect this change.

 

  • Financial Tools

This version includes three (3) new financial tools to automate essential financial duties. Primarily to be used by the Finance Division employees these new windows include the Estimate Staging (vouchering), Refund Processing (JVN220), and Administrative Hold (stop payment).

ü  Estimate Staging – For the District staff this is a read-only window that allows users to view the vouchering status of recently approved pay estimates. CCSJs listed have not been vouchered by our financial system.

ü  Administrative Hold – For the District staff and the Finance Division to place a payment hold on a contract. With permission granted through group security, users of this window may place, review or remove a hold for a contract.

ü  Refund Processing - For the District staff this is a read-only window that allows users to view the status of a contractor’s refund. The FIN Division will use this window to record funds received from the contractor. This window is aligned with the contract adjustment process to eliminate the accidental under or over payment to the contractor.

 

*   This is an optional window for recording DWRs. The original DWR window is still available and unchanged.

** This option is not available when in Standalone mode.


 


Thank you,

Stewart DeWitt

Construction Division

(512)416-2462

 

 

 

 

Stewart DeWitt

Construction Division

(512) 416-2462

Stewart.DeWitt@txdot.gov

 

 

Talk. Text. Crash.

Talk. Text. Crash.