Update to the SiteManager Material Sourcing Letter

 

SiteManager Material Sourcing Letter                                                                                        

Two items have changed recently with the SiteManager sourcing letter.

 

1.    The materials now include CST Structural materials. Previously the Structural branch forwarded their own ‘structural material only’ sourcing letter to the contractor. Now these materials will be included with the SiteManager sourcing letter and no second sourcing letter from the Structural branch will be sent. The Structural branch requests that you send them a copy of the contractor’s returned sourcing letter. Expect a follow-up email from Jana Buck with instructions.

 

2.    The contractor now has an option to choose a material producer from a pick list when available. The material producers listed are those with current* effective periods for the selected material. They are primarily QM material producers. Contractors may still type the name of the producer when either none is listed or the desired producer is not available in the list.

 

*Date when the report is generated

 

 

 

 

Stewart DeWitt

Construction Division

(512) 416-2462

Stewart.DeWitt@txdot.gov

 

 

Drunk drivers wreck cars. And lives.

Faces of Drunk Driving